Paradise Downs-2 drilling report
Posted: 26 February 2008
The Paradise Downs Coal Seam Gas Project, PL 171 Surat Basin, Queensland
Victoria Petroleum N.L. has been advised by Roma Petroleum N.L. the operator for PL 171 and the Paradise Downs CSG (Coal Seam Gas) Joint Venture, that following coring of the Paradise Downs-2 well to a total depth of 504 metres, wire line logs have been run and the well plugged.
"Vicpet is pleased to be participating in the Paradise Coal Seam Gas Joint Venture Phase 1 appraisal drilling program, a follow up to the 3 CSG wells drilled in 2001 in the central part of PL 171 in the Lawton
CSG Project appraisal drilling program by QGC," said John Kopcheff, Vicpet managing director
"We look forward to receiving from the operator the Netherlands, Sewell and Associates advice on obtaining certification of the coal seam gas resource in PL 171."
Posted by Richard Price, Editor, EnergyME.com
Information supplied by companies or PR agencies who are responsible for content.
Send press releases to richard@energyme.com |