Paradise Downs Coal Seam Gas Project
Posted: 18 February 2008
Victoria Petroleum N.L. was advised by Roma Petroleum N.L. the operator for PL 171 and the Paradise Downs CSG (Coal Seam Gas) Joint Venture, that following the completion of coring operations at Paradise Downs-1, the drilling rig has been moved to the Paradise Downs-2 drill site approximately approximately 1 ½ kilometres to the south.
The current operation at Paradise Downs-2 is coring ahead at 168 metres to the planned total depth of 400 metres.
Posted by Richard Price, Editor, EnergyME.com
Information supplied by companies or PR agencies who are responsible for content.
Send press releases to richard@energyme.com |